Southcott was commissioned to provide a hydraulic system to synchronously operate two separate travelling-formwork cars for Victoria's new Parkville Station Metro Tunnel. Southcott's proportional electrohydraulic Walvoil DPX050 valve operates the two travelling formwork systems' jacks driven via PID closed-loop linear actuator feedback and PWM command
Related categories
Builders in High Wycombe, WA